Sunday, 5 June 2011

The Lodge

Work on changes to the Lodge are proceeding, albeit much slower than we would have liked. We have now been down three times this year and have still not had a holiday! Each time we have been working. In fact we come home needing a break. The carpets have now been replaced, needed as they were damaged when the pipes burst in the big freeze last winter. The changes to the utility room are now complete. The new kitchen is almost done but when we last left the tiler was still working away. So hopefully after the next visit all will be shipshape; except that there is a problem with the new oven/grill unit and we have to arrange for that to be sorted. It really is never ending!

From this





To this





No comments:

Post a Comment